76. For delimiting the territory subject to a storage licence provided for in section 11 of the Act, the protective perimeter corresponds to 10% of the maximum width of the area of the vertical projection, on the ground, of the reservoir measured at its largest point.
O.C. 1253-2018, s. 76.